Commit Graph
10 Commits
Author SHA1 Message Date
jheapsandClaude Sonnet 5 ddb309f6db Learn fractional win-rate advantage instead of unbounded plus/minus
Piece-square and feature weights now converge to a presence-weighted
fractional win-rate per cell (percent of games won with a piece there
minus percent lost), tracked via running visits/score sums instead of
an incrementally clamped nudge. The training signal is also scaled by
how much of a game's result is NOT already explained by the winner's
average material edge (via the standard centipawn win-probability
curve), so a piece no longer gets credit merely for existing on the
winning side of a material blowout in the endgame.

Co-Authored-By: Claude Sonnet 5 <[email protected]>
Claude-Session: https://claude.ai/code/session_018CmAti1baCjidbJM2HeJfk
2026-08-31 13:40:57 -06:00
jheaps 2db4048ed2 Merge pull request 'Time out Stockfish process exit so finished self-play games cant wedge in the store' (#8) from fix/stockfish-dispose-hang into master
Build and Deploy / build-deploy (push) Successful in 1m18s
Reviewed-on: #8
2026-08-31 12:22:28 -06:00
jheapsandClaude Sonnet 5 2f53c2f0ed Time out Stockfish process exit so finished self-play games can't wedge in the store
DisposeAsync awaited WaitForExitAsync with no timeout; a Stockfish process that
doesn't exit on "quit" blocked GameStore's removal task forever, leaving the
finished game stuck in the store and cluttering the live-watch list indefinitely.

Co-Authored-By: Claude Sonnet 5 <[email protected]>
Claude-Session: https://claude.ai/code/session_018CmAti1baCjidbJM2HeJfk
2026-08-31 11:23:59 -06:00
jheaps 7562ded92a Merge pull request 'Bound how long the blog cache serves stale entries' (#7) from fix/blog-cache-staleness into master
Build and Deploy / build-deploy (push) Successful in 1m4s
Reviewed-on: #7
2026-08-26 17:24:29 -06:00
jheaps 769c7819e0 Merge pull request 'fix workflows take 2' (#6) from fix/workflows into master
Build and Deploy / build-deploy (push) Successful in 1m6s
Reviewed-on: #6
2026-08-26 15:46:12 -06:00
jheaps e8eb90a085 Merge pull request 'Put workflow in the right spot' (#4) from fix/workflows into master
Build and Deploy / build-deploy (push) Failing after 1m7s
Reviewed-on: #4
2026-08-26 15:39:47 -06:00
jheaps 088f05e0d2 Merge pull request 'add deploy workflow for gitea' (#3) from gitea/workflows into master
Build and Deploy / build (push) Failing after 34s
Build and Deploy / deploy (push) Skipped
Playwright Tests / playwright-tests (push) Failing after 50s
Reviewed-on: #3
2026-08-26 15:33:17 -06:00
jheaps ff1a131a3c Fix file path issues (hopefully) 2025-07-03 20:41:15 +00:00
jheaps f21a8320ce Get stockfish running on linux server 2025-07-03 20:08:41 +00:00
jheaps aa2084f3ee Add ip update capabilities 2025-03-14 10:27:45 -06:00